SUPPLY AND INSTALLATION OF TWO PASS REVERSE OSMOSIS AND ELECTRODEIONIZATION UNIT 2 X 1.300 m3/ D FOR AMANDI CCGT POWER PLANT IN GHANA

CONTRACTOR: METKA (MYTILINEOS GROUP)
END CLIENT: AMANDI ENERGY LIMITED
PROJECT DETAILS: Total Installed Plant Capacity 2.600 m3/day (Seawater RO), 2.000 m3/day (2nd Pass RO), 1.920 m3/day EDI – Demineralized water
YEAR: 2018

METKA is the business unit of MYTILINEOS S.A. undertaking the construction of large-scale EPC (Engineering-Procurement-Construction) projects, active in carrying out major power plant projects throughout Europe, the Middle East and Africa, with strong emphasis on highly-efficient power plant construction.

SYCHEM S.A as a sub-contractor of METKA S.A took over the construction of the WTP & WWTP for the 200 MW Combined Cycle Gas Turbine (CCGT) Power Plant in Takoradi, Ghana.

The WTP is supplied by a highly contaminated seawater supply and the pretreatment treated by chlorination, coagulation, MMF and ACF, followed by 1st pass 2.600 m3/day RO desalination, 2nd pass 2.000 m3/day RO and CEDI as polishing stage in order to, finally, produce 1.920 m3/day of high purity demineralized water (<0.1 μS/cm) as well as service water for the Power Plant.

System was fully tested with water at design pressure in SYCHEM Factory and delivered in 2017.